Publications
Apr 29, 2014
The information and analysis developed in this report is intended to identify the flow projections for the Blue Plains Wastewater Treatment Plant and associated Potomac Interceptor. It is also intended to aid the IMA-RC in identifying those actions needed to ensure that the long-term (Year 2040) wastewater management plans continue to address their individual and collective wastewater capacity and transmission needs in the BPSA, and to comply with the 2012 IMA capacity allocations.